| Application* |
|
| Site Address* |
|
| Installation Date* |
|
|
|
|
| Installation Type* |
|
| Number of Lifts* |
|
| Number of Stops* |
|
| |
Note: For the number of stops, include every floor. For Example: Basement, Ground & 1st floor would be considered as 3 Stops. |
| Rated Load Required |
|
| Desired Lift Speed |
|
| Lift Travel |
|
| |
Note: Lift travel is defined as distance from the finished floor level at the bottom floor to finished floor level at the top floor, an approximate value is fine. |
| Car Entrances |
|
| |
|
| |
|
| If Through Car Entrance |
|
require more than 1 entrance |
|
| Shaft Type* |
|
| Lift Shaft Area* |
|
| Minimum Cabin Size* |
|
| Pit Limitations* |
|
| Headroom Limitations* |
|
| Landing |
Note: headroom is a common term used when specifying lifts.
It is the measurement from the finished floor level (FFL) at the top floor, to the inside top of the shaft. |
| Door Frames* |
|
| Doors* |
|
| Car Interior |
|
| Operating Panel* |
|
| Operating Panel finish* |
|
| Walls* |
|
| Angles/ Skirts/Corners* |
|
| Ceiling/Lighting* |
|
| Flooring* |
|
| Car Doors* |
|